THE
INDEPENDENT YEARS
The
Independent Years
1898 - 1905
|
| The
first locomotive to run along the line was that of Pearson's,
the contractors who took over completion of the project
from Billups of Tredegarville,Cardiff in January 1897. It
was an 0-6-0ST loco built by The Hunslet Engine Company
in 1893, numbered 594 and named Ernest.
The locomotive would of course be primarily used for construction
work but its secondary job would have been its use on tours
of inspection both for the line Engineer and the Company
Directors.
By April 1898 Ernest had gone from the area and was
later used during the construction of the Wooton Bassett
to Patchway Line. |
|
| |
The
winter of 1897-98 found the LVR facing not only the problem
of acheiving the completion of general construction work
on time, but also the problem of acquiring locomotives and
rolling stock. The company successfully negotiated the hire
of a loco from the GWR.
It was this arrangement with the Great Western that saw
the arrival of ( No.1384 ) a 2-4-0 ST built by Sharp,
Stewart & Co. in 1876. This locomotive would work the
services for the first few months of operations, giving
the newly formed LVR company a breathing space until their
own power units could be purchased |
The GWR however,
were not in favour of supplying rolling stock and the decision
not too, left the LVR with a major problem. The Chairman
of the company, Colonel Archer Houblon came to the rescue
by purchasing four four-wheeled carriages himself and hiring
them to the LVR. They were acquired at a cost of £1300
and each coach carried a plate proclaiming Col. Archer Houblon
as the owner. After an agreed number of payments had been
realised, they would ultimately become the property of the
LVR. |

| Each
carriage had both first and second class compartments and
a total seating capacity of 32 persons. Second class seating
was of wooden construction and demanded a fare rate of roughly
1d a mile. The coaches had a central gangway with platforms
at both ends. These platforms were fitted with wrought iron
safety railings and allowed the guard to walk the length
of the train while it was in motion. The coaches were 26
feet 6 inches in length and were fitted with a vacuum brake.
Pictured above right is former East Garston resident, the
late Francis Worrell Kibblewhite Pounds on-board one of
the four LVR Carraiges
|
 |
MM |
Goods
rolling stock amounted to six second-hand GWR wagons acquired
at a cost of £91: 10s: 0d ( £91.50 ).
A further twelve pre-used wagons were obtained from
the Metropolitan Railway Carriage and Wagon Co. for £189,
These were all funded
by Col Archer Houblon and subject to the same type of agreement
as the four carriages. |
The
Senior Officers for the LVR at this time were:- |
General
Manager
Mr.W.H.H M Gipps |
Engineer
Mr. J.S. MacIntyre |
Company Secretary
Mr. H. Holmes |
| All
three individuals were instrumental in aiding the completion
of the railway and would play an important part in its future
operations. In addition
to the General managership of the LVR., Mr. Gipps was also
the traffic manager for the nearby Didcot, Newbury and Southampton
Railway. |

On
March the 31st 1898 the Board of Trade inspection of The
Lambourn Valley railway took place. The inspecting officer
Col Yorke, declared that subject to a speed limit of 25
miles an hour and axle loadings not exceeding 8 tons, opening
of the railway was approved. The private opening was set
for Saturday April the 2nd 1898 and the full public opening
for the following Monday, April the 4th.
And so it was at 10.30 am on April the 2nd, the inaugural
train consisting of engine 1384 and four LVR carriages stood
in the new bay platform at Newbury station. The loco itself
was bedecked in evergreens and festooned with flags. A picture
of the Queen was mounted on the front just above the buffers. |
 |

| The
invited dignitaries were duly welcomed by Colonel Archer
Houblon before being ushered to their onboard places. A
few minutes after 11a.m the guard called "Take your
seats please" and at 11.10 a.m the first official passenger
carrying train departed for Lambourn terminus. South Berkshire
M.P. Mr. G Mount was aboard, his duty was to open the line
officially on arrival at the terminus, both he and Mr Gipps
made the journey on the footplate along with the driver
and fireman. Thirty-Seven minutes after leaving Newbury,the
train arrived in Lambourn welcomed by a celebratory peel
of bells from the Parish Church and music from a local Brass
Band. Two further trips were made that day
each carrying around 80 fare-paying passengers.
|
mm |
On Monday the 4th of April, full public services commenced
running five daily trains coupled with an additional trip
on Saturday evenings.Over 900 passengers were carried during
the first week of scheduled operations. With regard to freight
and livestock traffic, the horse racing industry was first
to reap the benefits of the new line and within days of
opening, horses were being carried in quantity using boxes
hired from the Great Western Railway. Although
the line was now operational there were still several items
that required completion, these being :-
A loading stage at Great Shefford, the platform at Stockcross
and a small carriage shed, coal stage and siding at Lambourn
itself. Early June saw the finalisation of this work, construction
was brought to an end and the contractors duly paid off. |
The
next hurdle for the officers of the LVR to overcome would
be the purchase of their own motive power. The continued
locomotive hire charges of the GWR were a drain on resources
and could not be allowed to continue on an open ended basis.
By May 1898, following advise from Mr. MacIntyre, Colonel
Archer Houblon signed an agreement with Chapman and Furneaux
of Gateshead to build two locomotives for the LVR, The price
agreed was £1,330 each. Both locomotives arrived in
October and were named Aelfred and Ealhswith,
names that were synonymous with Lambourn's historical past.
Aelfred started work hauling passenger services for
the first time on the 18th of October 1898 |
mm |
It
was ordered that a plate be fixed in the cab of each
engine
stating that:-
.. |
|
This
engine is the property of Colonel Archer Houblon
of Welford Park Newbury |
|
|

| Aelfred
and Ealhswith, were identical 0-6-0 side tank
locos. Both engines were painted in Dark Blue livery, with
black lining, edged in white. The name plates were mounted
on the side tanks. The drivers spoke favourably of the engines
although they did in fact suffer a few gremlins in the early
days of use. Aelfred for instance was reported to"run
warm" and was also for some time, the victim of leaking
tubes. The engineer from Chapman and Furneaux spent time
on site repairing the faults, and within a few weeks the
locos were working fine. At this point, the final payment
of £660 was made to the manufacturers. |
| The
first full year of operation produced an overall profit
just short of a thousand pounds, this however did not take
into consideration the payment due to Col. Archer Houblon
under the terms of their agreement. In December 1902, despite
the company's precarious financial position, The Directors
decided to purchase a third locomotive. This would be built
by the Hunslet Engine company from Leeds and would be of
similar design to Aelfred and Ealhswith.
The LVR were offered deferred payments by the manufacturer
and Eadweade arrived in the Spring of 1903.
Perfect timing in fact, as Ealhswith was now in great
need of overhaul, this was undertaken by the GWR at a cost
of £276. The LVR brake van also needed major repairs,
this work would be carried out by the local Newbury firm
of Plenty's. |
| On
the 14th of July 1903, General Manager Mr. Gipps died after
a brief illness and he was subsequently replaced by Sidney
Woodley. Mr. Woodley's appointment was set to commence on
the 5th of September 1903. It was around this time that
the first enquiry was received from the GWR reference a
take-over of the line. The offer price was £45,000
and was reported at the time to have been greeted with some
surprise by the board of Directors. The board were still
optimistic about the future of the LVR, as a result, the
offer was politely declined. Towards the end of 1903 the
service was being operated by one engine in steam. |
| Services
continued but the financial situation did not improve and
once again in January 1904, the GWR approached the board
with a slightly increased take-over offer of £50,000
for the line and all its fixtures and fittings. Again on
the advice of it's Managing Director, J.B Squire, the LVR
rejected the deal. The business relationship between The
two rail companies remained very amicable with the GWR suggesting
that the smaller company run it's services using steam powered
railmotors as opposed to the current set-up. They, the GWR,
offered to hire two railmotors to the LVR for the total
sum of £420 per year. The idea seemed an attractive
one and the LVR decided in favour of the proposed plan. |

| On
the 3rd of May 1904 the Board of trade again inspected the
line, necessary because the axle loading of the railmotors
came out at 12 tons and the line had previously been sanctioned
for 8 tons. All was O.K and the railmotors commenced working
the line on the 15th of May. Locomotives still hauled the
goods' services for a further 4 weeks. Additional economies
were made by removing the lad porters from the intermediate
stations and allocating ticket collection duties to the
guard. |
| On
the 15th of June LVR Locomotives and rolling stock were
withdrawn from service and removed to Swindon to await auction,
this event took place in November 1904, and finally, Chairman
Col. Archer Houblon could recoup his original capital outlay.
The LVR had a new Engineer, Mr. J.N Taylor, succeeding Mr.
MacIntyre who had resigned some weeks earlier.
Mr Taylor oversaw the operation of the new railcars and
all worked as planned over the first months. There was still
talk of a GWR take-over and on the 7th of November an official
announcement from GWR confirmed that talks were indeed taking
place. This time however, there would be no increase in
the previous offer price of £50,000. |
| In
early 1905 it was discovered that the unusually high chalk
content in the water supply at Lambourn was having an adverse
effect on the power output of the small boilered rail motors.
Their performance had deteriorated to such a degree that
they were struggling to haul tail traffic, so much so, that
it became necessary to return to loco hauled services for
the last few months of independence. The loco and carriages
were again hired from the GWR. The LVR had come full circle
and was in a situation that did undoubtedly cause some degree
of embarrassment to it's board of Directors. |
Modified railmotors returned
to the line in May 1905 and worked alongside locomotive
power units where necessary. Back in January 1905 approval
had been given by both boards regarding the amalgamation
of the two companies and a date set for the official take-over.The
LVR line became a GWR line on the first of July 1905 and
most of the staff continued their employment with GWR.
A final meeting was held by both boards on the 19th of
July 1905 at Paddington.
From that day "The Independent Lambourn Valley Railway
Company" was no more. The Great Western Railway Company
now had the task of bringing the line up to its own high
exacting standards, reported at the time to be at an estimated,
£75,000.
|
|